SCOTT McBETH'S EAGLE PROJECT
November 3, 17-18, 2007 |
On November 3 scouts met at the Eagle candidate's house to build the frame for the roof and support posts, and attach the cork to both sides of a message board. On November 17 and 18, the message board was installed at the large and small dog running areas in Joaquin Miller Park in Oakland. Two signs were also made marking the two running areas. |
NOVEMBER 3
|
Circling up before project
|
Cutting cork for message board
|
Clamping braces on glued cork
|
Clamping other side
|
Sawing and framing demonstration
|
Gluing cork
|
Framing Roof
|
Drilling roof
|
NOVEMBER 17-18
|
Digging holes for support posts
|
Removing dirt
|
Removing rock
|
Moving post frame
|
Laying post frame in ground
|
Setting frame
|
Levelling frame
|
Reassembling roof
|
Setting roof beams
|
Setting posts with concrete
|
More concrete
|
Fitting roof on message board
|
Drilling roof to post frame
|